Pramuka Island Develops Connecting Channel
access_time May 09 2019 05:27 PM remove_red_eye 1184
Reported by Suparni | Translated by Nugroho Adibrata
Reported by Suparni | Translated by Nugroho Adibrata
A 16-meter-length connecting channel is developed in front of the regency inspectorate office, Pramuka Island, RW 04, Panggang Island Urban Village, North Thousand Islands.
This channel is connected to an absorption well for anticipating inundation when it rains
"This channel is connected to an absorption well for anticipating inundation when it rains," expressed Thousand Islands Water Resources Sub-agency Head, Ahmad Saiful, Thursday (5/9).
Its development involves 10 officers using 6-inch PVC pipe with 4 rods with a diameter of 40x40 centimeters with 50 centimeters depth and is made 3 control tanks along the channel.
Sheet Pile to Be Installed Along Gongseng Connecting Channel"It is targeted to be completed on May 12," he stated.